| Labour charges |
Skilled staff =200 × 1= 200 /day
Unskilled staff = 140 × 2= 280 /day
Total= 480 /day |
| Electric charges |
26 KWh × Rs. 3.5/ KWh
= Rs. 88.9~ 89 /day |
| Equipment depreciation* |
@ 10% per annumi.e.= Rs. 11, 020 /annum
i.e.= 31.19~32.0/day |
| Cost of Packaging material
|
(8"x 6" LDPE pouches)= 200 x 0.60= 120.00 |
| Water charges (200 litre) |
=200 x 0.06 = 12.00 |
| Maintenance cost |
= 400 per day |
| Rent of building |
= 200 per day. |
| TOTAL OVERHEAD COST |
≅ 1333 |