S. No. Parameter Calculated value
1 Maximum Basin Height (Z) 4,726 ms a.m.s.l.
2 Minimum Basin Height (z) 1,597 ms a.m.s.l.
3 Basin Relief (H) 3,129 ms
4 Relief Ratio (Rr) 0.045
5 Dissection Index (DI) 0.66
6 Channel Gradient (Cg) 28.69 m / km
7 Basin Slope (Sb) 0.045 (=4.5 %)
Table 5: Relief morphometric parameters of the drainage network of Vishav Drainage Basin.