S/N
Criteria
Conventional Ponds
Hydraulic Jump Enabled Ponds
Pond O
(Control)
Pond 1
Pond 2
1
2
3
4
Land Area
Cost of Land
Area of metal sheet
Total cost of construction with sheet
0.32 m2
$ 6.26
1.12 m2
$ 47.95
0.64 m2
$ 12.53
2.24 m2
$ 86.55
0.22 m2
$ 4.24
0.76 m2
$ 32.49
0.37 m2
$ 7.29
1.30 m2
$ 50.36