S/N

Criteria

Conventional Ponds

Hydraulic Jump Enabled Ponds

Pond O

(Control)

Pond 1

Pond 2

Pond 1

Pond 2

1

 

2

 

3

 

4

Land Area

 

Cost of Land

 

Area of metal sheet

 

Total cost of construction with sheet

0.32 m2

 

$ 6.26

 

1.12 m2

 

$ 47.95

0.32 m2

 

$ 6.26

 

1.12 m2

 

$ 47.95

0.64 m2

 

$ 12.53

 

2.24 m2

 

$ 86.55

0.22 m2

 

$ 4.24

 

0.76 m2

 

$ 32.49

0.37 m2

 

$ 7.29

 

1.30 m2

 

$ 50.36

Table 2: Comparison between Pond with Hydraulic Jump(s) and the Conventional Pond that will achieve the same Bacteria Reduction.