![]() |
Figure 1: Representative pictures of Songchon constructed wetland (SCW) in spring 2011: (a) inflow point with movable weir and ultrasonic wave water gage; (b) 1st treatment process with vegetation; (c) site overview of 2nd treatment process and observation deck; (d) a culvert to connect each pond; (e) outflow point to the main drainage canal. |