S. No.
DAY OF STUDY
METHANE YIELD
(m³/kg COD)
1
1
0.323
2
2
0.340
3
3
0.352
4
4
0.366
5
5
0.369
6
6
0.374
7
7
0.378
8
8
0.385
9
9
0.389
10
10
0.410
(Temperature 40°C Loading rates: 3 kg COD/m³ day HRT: 24 hours)
Table 3:
Effect of Days on Methane Production (With Total Recycling).