| Particulars |
Value |
| a |
Waste processing |
3000 litre/day |
| b |
Capital cost |
12 lakh |
| c |
Operation & maintenance cost |
1.2 lakh/year |
| Potential returns |
| d |
Biogas generation |
147.67m³(max) |
| e |
Equivalent power @ 2 kwh/m³ |
294 kWhr/day |
| f |
Cost of power @ Rs. 4/kwh |
4.3 lakh/year |
| g |
Quantity of manure |
75kg/day |
| h |
Cost of manure @ Rs. 3/kg |
0.8 lakh/year |
| Savings after O&M [(h+f)-c] |
3.9 lakh/year |