Installation

Volume of IC reactor [m3]

Biogas production
[Nm3/d]

Biogas utilization

SHP Harmanec
(paper industry)

315

520-750

Boilers – heating for production needs

EnviralLeopoldov
(distillery)

301

2200-3000

Boilers – heating for production needs

Heineken Hurbanovo
(brewery)

1004

4600-6100

CHP – sale of electricity, heating of wastewater

*Kappa Štúrovo
(cellulose and paper industry)

2470

16125

Boilers – heating for production needs

*TopvarTopoľčany
(brewery)

250

1440

Boilers – heating of wastewater and industrial buildings

* Operation discontinued
Table 2: IC reactors in Slovakia.