Figure 1: Schematic of thermally induced phase separation (TIPS) process (1) dope vessel, (2) bore liquid vessel, (3) gear pump, (4) bore liquid flow meter, (5) spinneret, (6) quench tank, (7) water trough, (8) control panel, (9) N2 cylinder