Resource Slaughterhouse Purpose
  Hargeisa Berbera  
Transport trucks 10 owned, 2 rented 0 Transport meat, solid wastes and workers
Electricity generators 4 0 Adequate lights provision, pumping of water, boiling of water
Sewage exhausters 1 0 Emptying the 4 septic tanks
Boreholes 1 0 Provision of potable water
Water reservoir tanks 2 overhead & 1 underground (16m3 each) 1 on ground surface level tank (10m3) Preserving water for next day’s slaughter operations
Water pumps 1 0 Pumping water
Table 3: Available resources.