Pay Zone Thickness (h) |
48 |
ft |
Reservoir Pressure |
5035 |
psi |
Horizontal Permeability (Kh) |
54 |
md |
Bore Hole diameter |
7.875 |
in |
Vertical Permeability (Kv) |
19 |
md |
Drill pipe diameter |
4.5 |
in |
Skin Factor (s) |
0 |
|
Borehole length |
600 |
ft |
Fluid Viscosity(μ) |
0.5 |
cp |
Borehole roughness |
0.05 |
in |
Fluid formation volume factor (Bf) |
1.15 |
rb/stb |
Boundary Distance(yb) |
2000 |
ft |
Fluid density (ρf) |
51 |
Ib/ft3 |
Penetration Rate (Rp) |
27.69 |
ft/hr |
UB drowdown pressure |
535 |
psi |
|
|
|
|