Reservoir method Extractable Recovery (%) Hypothetical Amount of Oil Recovered, BBls Hypothetical Amount of Oil Recovered, BBls Cost Method Recovery Net Profit After Technology cost
Hot water/toluene 53 313,026,766 21,911,873,634 60$ 3,130,267,662
Flooding. Core A1
Hot water/toluene 58.63 355,561,583 24,889,310,868 60$ 3,555,615,838
Flooding. Core A11
Table 6: Simple economic analysis for optimum recovery technique and its recoveries for a hypothetical tar-mat in Front of Oil (OOIP) case.