| Modelling |
Model |
Parameter |
Unit |
Minimum |
Maximum |
| Runoff Volume |
Deficit and constant loss |
Initial deficit |
MM |
0 |
500 |
| Maximum deficit |
MM |
0 |
500 |
| Constant rate |
MM/HR |
0.1 |
5 |
| Direct runoff transformation |
Snyder’s UH |
Lag time |
HR |
0.1 |
500 |
| Peaking coefficient |
- |
0.1 |
0.1 |
| Base flow |
Exponential Recession |
Initial base flow |
m3/s |
0 |
100000 |
| Recession factor |
|
0.000011 |
- |
| Flow to peak flow ratio |
|
0 |
1 |
|