        | Modelling | Model | Parameter | Unit | Minimum | Maximum |  
        | Runoff Volume | Deficit and constant loss | Initial deficit | MM | 0 | 500 |  
        | Maximum deficit | MM | 0 | 500 |  
        | Constant rate | MM/HR | 0.1 | 5 |  
        | Direct runoff transformation | Snyder’s UH | Lag time | HR | 0.1 | 500 |  
        | Peaking coefficient | - | 0.1 | 0.1 |  
        | Base flow | Exponential Recession | Initial base flow | m3/s | 0 | 100000 |  
        | Recession factor |  | 0.000011 | - |  
        | Flow to peak flow ratio |  | 0 | 1 |  |