alexa An Empirical Study on Critical Failure Factors and Business Intelligent System Failure at Pre-implementation Phase in Small and Medium Enterprises in Pakistan | Open Access Journals
ISSN: 2151-6219
Business and Economics Journal
Make the best use of Scientific Research and information from our 700+ peer reviewed, Open Access Journals that operates with the help of 50,000+ Editorial Board Members and esteemed reviewers and 1000+ Scientific associations in Medical, Clinical, Pharmaceutical, Engineering, Technology and Management Fields.
Meet Inspiring Speakers and Experts at our 3000+ Global Conferenceseries Events with over 600+ Conferences, 1200+ Symposiums and 1200+ Workshops on
Medical, Pharma, Engineering, Science, Technology and Business

An Empirical Study on Critical Failure Factors and Business Intelligent System Failure at Pre-implementation Phase in Small and Medium Enterprises in Pakistan

Nimra Iffat1*, Shahzad Chaudhry M2, Bilal3, Wasif Ahmad4 and Anila Rabail1

1University of the Punjab, Lahore, Pakistan

2Government College University Lahore, Pakistan

3University of Lahore, Pakistan

4National College of Business and Economics, Lahore, Pakistan

*Corresponding Author:
Nimra Iffat
University of the Punjab, Lahore 54890, Pakistan
Tel: +92 42 99231105
E-mail: [email protected]

Received date: September 02, 2015 Accepted date: October 17, 2015 Published date: October 26, 2015

Citation: Iffat N, Shahzad Chaudhry M, Bilal, Ahmad W, Rabail A (2015) An Empirical Study on Critical Failure Factors and Business Intelligent System Failure at Pre-implementation Phase in Small and Medium Enterprises in Pakistan. Bus Eco J 7:193. doi: 10.4172/2151-6219.1000193

Copyright: © 2015 Iffat N, et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

Visit for more related articles at Business and Economics Journal

Abstract

Business Intelligence is one of best way to analyze the critical capabilities of organization, but the implementation phases of these competences are frequently overwhelmed with tribulations. That’s why many projects of such capabilities fail, while others succeed. The basic purpose of this research is to identify the critical failure factors (CFF) in the pre implementation phase of Business Intelligent (BI) system and to test association between these critical factors. Small and Medium enterprises (SMEs) cannot be neglected in developing countries like Pakistan. They are chosen as target population because of its vital role in the development of economy such as creating employment opportunities, increasing GDP%, increasing the volume of export etc. Based on four hundred and fifty respondents, the barriers of cost are valuing among top five with highest value of mean which are additional cost associated with the managing BI, lack of financial resources, upfront cost, cost of obtaining BI software and setup cost respectively. This symbolizes the costing factor yet a foremost barrier in preponderance items in order to analyze BI in pre-implementation phase.

Keywords

Business Intelligence; Critical failure factor; Small and medium enterprises; Pre implementation phase

Introduction

The narration of successful business, in this industrialize uprising era is all about supervising, systemizing, measuring, monitoring and analyzing the transactional data with technology, proficiently and effectively. Undeniably, distinctiveness of contemporary organizations is the data revolution that has been steadily taking place over the last two decades. Many practitioners and scholars even see organizational and management decision making to be in the middle of a gradual transformation from an instinct- driven “art” to a progressively datadriven approach. Day to day massive amount of raw data is produced during every operational transaction in an organization [1]. BI converts information into knowledge with human judgment and intuitions. So we can say anecdotes of achievement now become yarn of managing intelligence [2].

According to “Howard Dresner” of Gartner research in 1989 BI is set of activities such as collecting, consolidating, organizing and presenting information in such approach which let the corporate world to craft the better business decisions toward their desired goals. BI is tool, technology or process within organizations ascertain thought provoking environment. BI makes the most of Business Processes and possessions in resourceful and proficient manner, improve the proactive decision making, curtail expenditure and capitalize the profit [3,4] placed BI in the top ten strategic technologies for 2014. These results are consistent with those of the last five years, which show that organizations are still struggling to make progress with BI for profitability and productivity [5,6].

The implementation of BI systems is colossal challenge. In business, it is allied not merely with advantages and benefits, but on the other hand, in some organization it also generates certain barricades, tribulations and risks. Not merely technology plays a vital part, but on top of all factors, such as community, processes, managing style and traditions of the organization, are also imperative. These factors frequently symbolize a huge predicament and can disrupt or avert attempts and efforts of deployment of an effectual BI solution for operating task of organizations. These factors are acknowledged as critical factors. The current purpose of study is to recognize CFF in pre implementation phase of BI system.

Literature Review

According to [7] CFF are basically set of tasks when arise as a hindrance before or after the implementation of BI. Its implementation is not a simple and easier chore; instead it entails the complex infrastructure, long term appropriate resources and development of decades [8]. According to [9-14] technological barriers to BI adoptions are; lack of skills to implement BI/data warehouse, lack of technology (pre-BI infrastructure), data security concerns (pervasive BI and outsourced version), frequent data latency issues, BI project complexity, BI tools highly specialized for wide spread use, complexities of data management, fragmented data sources in the enterprise. From organizational perspective barrier to BI adoption are running cost, lack of executive board interest, no real or tangible benefits, poor return of investment, lack of knowledge about BI product, implementation time lags. From environmental perspective are insufficient government supports for BI initiatives, lack of a complete BI Suite offering by any vendor, typical BI systems not optimized for OLTP. According to [15] critical factor for BI failures are management issues, changing requirements and objectives, Justification and budget, organization and staffing, user issues, collaborative work problems, project planning and scheduling, data warehouse standards, tools and vendors, security, data quality, integration, data warehouse architecture, and performance.

According to [16] two manager aspect management and technology are found to be indispensable impediments in the BI system failure. They embrace top management support, change management, clear vision and mission, organizational culture, data information accuracy, sustainable data quality, suitability of hardware and system reliability.

Moreover, in literature reviews CFF are not only of technical or managerial nature but social factors also play vital part in this domain. Software and system of any organization comprises of three fundamentals elements which makes possible the successful running of project. These are people, technology and processes toward the implementation of different kind of strategies in organization: In corporate tactics management try to make alignment between BI system and organizational process to increase the effectiveness of business decision making, growth and development whereas in technology perspective strategies updation of technology, software’s and advancement is integrated parallel.

Marie Barry [17] investigate the main areas of risk are scope creep, uncontrolled finances, Poor Communication, stake holder non involvement, skills shortage, unavailability of tools and technology, uncontrolled quality of deliverables, poor, wrong or no leader, technical difficulties, legal difficulties [18-26]. Identified common mistakes in implementing BI systems are; using ad hoc practices to select and fund BI project, providing inadequate governance to BI program management, establishing de facto program governance based on the initial BI projects, failing to strategically position BI in business organization, not providing adequate resources and funding needed for successful BI initiative.

Research Problem

Utters that organization do not demonstrate the failure of BI system execution. Nonetheless, BI failure rate is awfully high due to its complex structure [27]. This research paper is to find out the barriers of BI pre-implementation system in Pakistan. To make certain objectives of research being attained; the objectives were devised as follows:

1. Identify the BI adoption level in Pakistan.

2. To identify the significant BI CFF in SMEs Pakistan.

3. To analyze the association between failure of preimplementation phase of BI and its CFF in SMEs Pakistan.

Research Questions

The following research questions were devised for which research study has been conducted.

1. What is the BI adoption level in Pakistan?

2. What are significant BI CFF in pre implementation phase in SMEs Pakistan.

3. Is there is any association between failure of preimplementation phase of BI and its failure factor in SMEs Pakistan.

Research Framework

Figure 1 shows Framework of BI barriers in Pre-Implementation of BI system Failu Hypothesis Formulation.

business-and-economics-journal-framework-of-bi

Figure 1: Framework of BI barriers in Pre-Implementation of BI system Failu.

Hypothesis Formulation

H0: There is no significant relationship between failure of BI system in pre implementation phase and critical failure factors.

H1: There is significant relationship between failure of BI system in pre implementation phase and critical failure factors.

Research Methodology

The research employs quantitative techniques to scrutinize the critical failure factors. SPSS is used for the empirical analysis through regression and Factor analysis [28-32]. Random sampling Techniques is used to collect the Data through questionnaire. Four hundred and fifty respondents participate in this research. The questionnaire is designed to collect information pertaining to demographic of respondents and company, BI adoption level, barriers to BI adoption [33-38] (Tables 1 and 2).

Category # Barriers
Technological Barriers 6
Organizational Barriers 9
Environmental Barriers 3
Financial Barriers 6
Total 24

Table 1: Summary of BI Barriers based on Categories.

Sr # Category Factors
1
2
3
4
5
6
Cost Factor CF1:UpfrontCost
CF2: Setup Cost
CF3: Cost of Obtaining BI Software
CF4:AdditionalCostassociatedwithmanagingBI
CF5: Lack of Financial resource
CF6:Cost required to support management and training
7
8
9
10
11
12
13
14
15
Organizational Factor OF1:Lack of executive board interest
OF2: Lack of Knowledge about BI product
OF3:Lack of user oriented change management
OF4:Lack of Business centric championship
OF5:Lack of Business vision and Planning
OF6:Organizational resistance
OF7: Inadequate governance for BI program
OF8: Poor Business and BI alignment
OF9: Incomplete Business requirements
16
17
18
19
20
21
Technological Factors TF1:Lack of Skill to handle BI program
TF2:Lack of technology
TF3:Data Security Concerns
TF4:Poor Data Quality
TF5:BI Software complexity
TF6:Complexity of Data Management
22
23
24
Environment Factor EF1:Insufficient Government support for BI initiatives
EF2:Lack of user adoption
EF3:Lack of interest from user solution

Table 2: Detail of Factors for Research.

Reliability test

For consistency of BI barriers, a reliability test is demeanor to identify the Cronbach’s alpha value. Value of Cronbach’s alpha is 0.661 which is not acceptable [39-43]. A comprehensive analysis was conducted to perk up the Cronbach’s alpha value. The decision to remove some factors is made from the table Cronbach’s alpha value if the item has deleted [44-48].

Cronbach’s alpha value after extended research

By removing 8 factors related to organizational and environment factor including OF1:Lack of executive board interest, OF2: Lack of Knowledge about BI product, OF3:Lack of user oriented change management, OF4:Lack of Business centric championship, OF5:Lack of Business vision and Planning, OF6:Organizational resistance, OF7: Inadequate governance for BI program, EF1:Insufficient Government support for BI initiatives, EF3: Lack of interest from user solution from reliability analysis, the value of Cronbach’s alpha for barriers increased to 0.707. Value is acceptable for further research and testing [49-53].

Descriptive analysis

A descriptive analysis was applied to portray the demographic of participants. The demonstration of the basic demographic characteristics includes gender, age, position and company industry [54-58].

Demographic Profile

Pie charts (Figures 2 and 3) demonstrate that collected sampling consists of 64.44% (288 participants) male and 35.56% (162 participants) female where mass participants were in the slot of 21-30 which consisted 42.67% (192 participants) [59-63]. There were 31.78% (143 participants) resides into category of age from 31-40 and 25.56% (115 participants) in age group of 41-50.

business-and-economics-journal-pie-chart

Figure 2: Pie chart demonstrate the collected.

business-and-economics-journal-pie-chart-demonstrate

Figure 3: Pie chart demonstrate the collected.

Pie chart (Figure 4) presents categorization of employees. Who works under the designation of business management or middle management in an organization consists of 53.87% (242 participants) and subsequently executive staff includes 22.1% (124 participants) [64-70]. Afterward the position of IT Professionals were containing 17.78% (80 Participants), 0.89% (40 participants) respectively.

business-and-economics-journal-pie-chart-categorization

Figure 4: Pie chart presents categorization of employees.

Different natures of organization’s percentage are presented in pie chart (Figure 5). Among all 12.89% data of respondents has been gathered from advertising/marketing industry, 4.225 from consultancy field, where as 7.11% data was assembled from food and beverages industry [71-75]. 4.00% of the respondents data was from Manufacturing industry, 6.67% from education and institutions, 10.89% from the Textile/Apparels, 10.00% from Horticulture, 8% from the telecommunication franchises sector, 9.11% from were serviced in information technology and 17.11% are listed in hospitality and travel sector [75-80].

business-and-economics-journal-natures-of-organization

Figure 5: Different natures of organization’s percentage are presented in pie chart.

Means and standard deviation

The mean and standard deviation for twenty four BI barriers describe in Table 3 were chosen to categorize the important barriers by measure up to the mean value. The highest value of mean demonstrate the vital barrier where the lowest value of mean shows the nonimportant barriers of BI during pre-implementation phase of BI system [81,82].

BI Barriers N Mean Std. Deviation
CF4:AdditionalCostassociatedwithmanagingBI 450 3.7756 1.01034
CF5:LackofFinancialresource 450 3.7533 2.62489
CF1:UpfrontCost 450 3.7200 1.47490
CF3:CostofObtaningBISoftware 450 3.6889 .99715
CF2:SetupCost 450 3.3533 1.23319
TF1:LackofSkilltohandleBIprogram 450 3.3089 1.46683
CF6:Costrquiredtosupportmanagmentandtraining 450 3.2333 1.30145
TF5:BISoftwarecomplexity 450 3.1733 1.33355
OF9:IncompleteBusinessrequirements 450 2.9400 1.41373
OF8:PoorBusinessandBIalignment 450 2.9200 1.37032
TF3:DataSecurityConcerns 450 2.8911 1.36751
TF2:Lackoftechnology 450 2.8556 1.44968
TF4:PoorDataQuality 450 2.8000 1.45305
TF6:ComplexityofDataManagment 450 2.7867 1.58608
OF3:Lackofuserorientedchangemanagment 450 2.2378 1.60980
EF2:Lackofuseradoption 450 1.4600 1.07800
Valid N (listwise) 450    

Table 3: Describe the mean and standard deviation for twenty four BI barriers.

Based on four hundred and fifty respondents, the barriers of cost are valuing among top five with highest value of mean which are Additional cost associated with the managing BI, Lack of financial resources, Upfront cost, Cost of obtaining BI software and Setup cost respectively [83]. This symbolizes the costing factor yet a foremost barrier in preponderance items in order to analyze BI in pre implementation phase.

Factor component analysis

KMO and bartlett’s test: Value of KMO is 0.754 it represent the sampling adequacy is at satisfactory level. Bartlett's test of sphericity is significant with the value of 0.000. It is small enough to reject the null hypothesis. This means that correspondence matrix is not an identity matrix [84].

Principle component analysis:

Total variance explained: The Table 1, Appendix shows all the factors involved in research study extractable from the scrutiny along with their eigenvalues, In this analysis, there are four factors with eigenvalues higher than 1. The “percentage of variance” values enlighten that how much of the total variability can be calculated by each of these abstract factors. Factor 1 report for 21.275% of the variability in all 16 variables, factor 2 accounts for 10.467% of the variability in all and so on. All the remaining factors are not significant. Cumulative percent column accounts for 47.117% variability among all 16 variables.

Component matrix: The Table 2, Appendix demonstrates the loadings of the sixteen factors into four factors. The slit on the table symbolize loadings that have value less than 0.5. We covered up all loadings less than value of 0.5.

Regression analysis

Regression analysis conducted to identify the association/ relationship between sixteen barriers extracted through factor analysis. Sixteen barriers are categorized into four major factors which are further used as independent variables to predict failure of BI system as the solely dependent variable [71] (Table 4).

  Category BI Barriers
1 Technological Factor TF1:Lack of Skill to handle BI program
TF2:Lack of technology
TF3:Data Security Concerns
TF4:Complexity of Data Management
TF5:BI Software complexity
TF6:Poor Data Quality
2 Cost Factor CF1:Upfront Cost
CF2:Setup Cost,
CF3:Cost of Obtaining BI Software Additional
CF4:Cost associated with managing BI
CF5:Lack of Financial resource
CF6:Cost required to support management and training
3 Organizational Factor OF9:Poor Business and BI alignment
OF10:Lack of user oriented change management
OF3:Incomplete Business requirements
4 Environmental Factor EF2:Lack of User adoption

Table 4: Represents various Categories of BI Barriers.

Regression analysis on critical technological barriers against failure of BI system: Based on regression result in (Table 3, Appendix), the P-value in ANOVA is 0.001 which is less than 0.05. Therefore, there is significant relationship between critical technological barriers and BI System failure.

R square (R2) is interpreted as the correlation coefficient squared and also said to be coefficient of determination. There is 2% of total of Y (failure of BI pre implementation phase) explained by the regression model consisting six technological barrier mentioned in Table 4.

Regression analysis on critical costing barriers against failure of BI system: Based on regression result represented in Table 4, Appendix, the P-value in ANOVA is 0.000 which is less than 0.05. Therefore, there is significant relationship between critical cost barriers and BI System failure.

R square (R2) value represents there is 4% of total of Y (failure of BI pre implementation phase) explained by the regression model consisting six costing barriers mentioned in Table 4.

Regression analysis on critical environmental barriers against failure of BI system: Based on regression result represented in Table 5, Appendix, the P-value in ANOVA is 0.266 which is greater than 0.05. Therefore, there is no significant relationship between critical environmental barriers and BI System failure. R square (R2) is interpreted as there is 0.3% of total of Y (failure of BI pre implementation phase) explained by the regression model consisting one environmental barrier mentioned in Table 4.

Regression analysis on critical organizational barriers against failure of BI system: Based on regression result represented in Table 6, Appendix the P-value in ANOVA is 0.000 which is less than 0.05. Therefore, there is significant relationship between critical environmental barriers and BI System failure.

R square (R2) is interpreted as there is 3% of total of Y (failure of BI pre implementation phase) explained by the regression model consisting three organizational barriers mentioned in Table 4.

Overall significance of the model: In the model summary Table 7, Appendix, facilitates to measure about the fitness of the model. Value of R-squared varies between 0 and 1. In this case it is 0.136, so 13% of the variance in failure of BI system at pre-implementation phase can be explained by organizational factors, environmental factors, costing factors and technological Factors. The column standard error of the estimate helps to measure of how much R is predicted to vary from one sample to the next. Here the value of standard error of estimate is 1.19557.

Based on regression result represents the P-value in ANOVA is 0.000, 0.000 and 0.001 for technological, cost and organizational barriers which is less than 0.05. Therefore, there is significant relationship between critical barriers and BI System failure.

Whereas P value of environmental barriers is 0.328 which is higher than 0.05. It represents that there is no significance relationship between the environmental barriers and failure of BI system.

In coefficient table summary size of the coefficient for each independent variable measure the intensity of the outcome that variable is having on the dependent variable along with the directions. First coefficient of cost factor demonstrating that [80]. 552 of the failure of BI system variable is expected to increase when that cost barriers variable increases by one, holding all other variables(environmental, technological and organizational) constant. Second coefficient of technological factor demonstrating that -.319 of the Failure of BI system variable is expected to decrease when that technological barriers variable increases by one, holding all other variables(environmental, cost and organizational) constant. Third coefficient of environmental factor demonstrating that 0.051 of the failure of BI system variable is expected to increase when that environmental barriers variable increases by one, holding all other variables (cost, technological and organizational) constant. Fourth coefficient of cost factor demonstrating that -.210 of the failure of BI system variable is expected to decrease when that organizational barriers variable increases by one, holding all other variables (environmental, technological and cost) constant.

Tools and software other than BI

Pie charts in Figure 6 characterize what kind of technology organization adopted other than BI. The collected sampling consists of 40.67% who adopted Microsoft Access for data base management and business operations [75]. 17.33% using Microsoft excel, 16.22% using database management system, 15.11% using homegrown systems and software according to their feasibility.

business-and-economics-journal-technology-organization-adopted

Figure 6: Pie charts characterize what kind of technology organization adopted other than BI.

Findings and Conclusion

Research study prevail the BI adoption level in Pakistan. Only 2 percent organizations of SMEs using BI system for their decision making others are using different kind of tools for the effective management. So it clearly identifies the usage of BI system. This has answered the research question one ‘What are the adoption levels in SMEs of Pakistan? In further study some significance barriers identify essentially impacting the corporate decision to adopt BI modules. Through reliability analysis some factors were removed and to check the significance of remaining factors, Factor component analysis testing were performed.

By evaluating the result between descriptive and regression, four hundred and fifty respondents, the barriers of cost are valuing among top five with highest value of mean which are Additional cost associated with the managing BI, Lack of financial resources, Upfront cost, Cost of obtaining BI software and Setup cost respectively. This symbolizes the costing factor yet a foremost barrier in preponderance items in order to analyze BI in pre implementation phase.

The three top lowest mean scores which less agreed by respondents are Poor Data Quality, Complexity of Data management, Lack of Business Vision and Planning. Their mean scoring are from range 2.76 to 1.46 which is close to neutral score. This helps to explain the most significance factors as a critical barrier toward the implementation of BI in the pre-implementation Phase.

Through regression analysis among the four critical barriers categorized as Organizational Barriers, Technological barriers, Cost barriers and environmental barriers three barriers are associated with Failure of BI system. On the other hand environmental barriers are insignificant with the failure of BI system.

References

Select your language of interest to view the total content in your interested language
Post your comment

Share This Article

Relevant Topics

Article Usage

  • Total views: 8341
  • [From(publication date):
    March-2016 - Aug 20, 2017]
  • Breakdown by view type
  • HTML page views : 8063
  • PDF downloads :278
 

Post your comment

captcha   Reload  Can't read the image? click here to refresh

Peer Reviewed Journals
 
Make the best use of Scientific Research and information from our 700 + peer reviewed, Open Access Journals
International Conferences 2017-18
 
Meet Inspiring Speakers and Experts at our 3000+ Global Annual Meetings

Contact Us

 
© 2008-2017 OMICS International - Open Access Publisher. Best viewed in Mozilla Firefox | Google Chrome | Above IE 7.0 version
adwords