alexa Cuckoo Search Algorithm Application for Economic Dispatch with Wind Farm in Power Systems | Open Access Journals
ISSN: 2229-8711
Global Journal of Technology and Optimization
Make the best use of Scientific Research and information from our 700+ peer reviewed, Open Access Journals that operates with the help of 50,000+ Editorial Board Members and esteemed reviewers and 1000+ Scientific associations in Medical, Clinical, Pharmaceutical, Engineering, Technology and Management Fields.
Meet Inspiring Speakers and Experts at our 3000+ Global Conferenceseries Events with over 600+ Conferences, 1200+ Symposiums and 1200+ Workshops on
Medical, Pharma, Engineering, Science, Technology and Business

Cuckoo Search Algorithm Application for Economic Dispatch with Wind Farm in Power Systems

Dung Anh Le and Dieu Ngoc Vo*

Department of Power Systems, Ho Chi Minh City University of Technology, Ho Chi Minh City, Vietnam

*Corresponding Author:
Dieu Ngoc Vo
Department of Power Systems
Ho Chi Minh City University of Technology
Ho Chi Minh City, Vietnam
Tel: +84-8-38647256 extn 5730
E-mail: [email protected]/[email protected]

Received date: September 27, 2016; Accepted date: December 08, 2016; Published date: December 15, 2016

Citation: Le DA, Vo DN (2016) Cuckoo Search Algorithm Application for Economic Dispatch with Wind Farm in Power Systems. Global J Technol Optim 7:204. doi:10.4172/2229-8711.1000204

Copyright: © 2016 Le DA, et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

Visit for more related articles at Global Journal of Technology and Optimization

Abstract

This paper introduces a new method to solve economic dispatch problem in power system operation with wind farm (WF) connecting. The method is cuckoo search algorithm (CSA) which can to solve effective ED problem. The subject of this paper is optimal solutions about total power output each generator and WF with minimum operation cost in power system. The research study CSA and develop this method which become new method more efficient than former methods. CSA apply to solve ED problem with WF which give the best results and programming time. For ED problem simulator, program applies 30 buses IEEE system and Matpower 4.1 Toolbox to run power system with WF connecting. The results of this method also are compared to other previous methods and assess its results.

Keywords

Economic dispatch; Cuckoo search; Wind turbine; Wind farm

Abbreviations:

Np: Number of Particles; PD: Total Load System Demand; Ai. Bi. Ci: Cost Coefficients For Quadratic Cost Function of Generator I; Ei. Fi: Cost Coefficients of Generator I Reflecting Valve- Point Effects; Bij. B0i. B00: B-Matrix Coefficients For Transmission; Ng: Number of Generators; δI: Voltage Angle At Bus I; θIj: Voltage Angle Difference Between Buses I And J In Rad; Gij.Bij: Inductor and Inductance of Line Between Buses I And J; Gl: Inductor of Branch L; Li: Voltage Stability Index At Bus I; Nb: Total Buses; Nd: Number of Load Buses; Ng: Number of Generator Buses; Nl: Total Number of Transmission Lines; NT: Number of Tap Changer; Pdi. Qdi: Power and Reactive Power Demand at Bus I; Pgi.Qgi: Power and Reactive Power Demand at Generator I; Qci: Reactvie Power Supplement at Bus I; Sli : Power on Transmission Line I; Tk: Tap Changer Level Position; Vgi: Voltage of Generator I; Vli: Voltage of Load Bus I; Vi.θI: Voltage and Voltage Angle at Bus I

Introduction

Economic dispatch (ED) optimization of power system is important problem in power generators system operation. Recently, power supply companies concentrate to ensure economic problem of power system because it can help the systems reduce operation costs and output the best power optimization of generators in system since practical numerical optimization methods applied to power system engineering and operation. The value contributed by the power system optimization is considerable in economics with hundreds of millions of dollars saved annually for large utilities from fuel cost, operational reliability, and security. On the other hand, power systems have been developed larger and more complicated due to the increase of load demand, leading to consuming more fossil fuel for thermal power plants and releasing more emission into the environment. Presently, hydro power plants become more important in power systems because the fuel sources for thermal plants will be exhausting in a not long future meanwhile thermal plants using fossil fuel cause environmental pollution. Moreover, alternative sources of energy such as wind power, solar energy, fuel cells, etc. are still being developed with a very limited capacity due to technical limitations and natural conditions. Nuclear power is not popular since it is facing public objection for the safety reason. Therefore, hydro and gas turbine power plants are considered as main contribution to power systems for the near future due to the advantages of cheap fuel cost and pollution free. However, scheduling of hydro plants depends on hydraulic constraint and gas supplied for gas turbine power plants can be restricted due limited reserve. For those reasons, wind farms builds in many countries on the world because wind farms have many advantages such as not pollution and fuel cost. However, there are some complicated calculations when wind farms connect to power system. ED is one of problems should solve to optimize system with wind farms operation.

There are many methods which solve ED problem such as Lagrange function, Newton’s method, Particle Swarm Optimization (PSO) and POS Improvement (PSOI). However, it spends more time and gives not exact results [1-6]. Cuckoo search (CS) algorithm develops and effects more than PSO methods in optimization and ED problems with wind farm connecting. CS combines Levy flights were used in information technology and other science technical fields from 2009 up today [7-12]. However, there are very few CS applications for ED in power system operation.

This paper introduces a new method, CS method is proposed for solving the ED with wind farms problem. The research propose minimizing the cost of system operation which include constraints such as real power losses, reactive power limits of generators and wind farm. The program has been tested on the IEEE 30-bus system with wind farms and the obtained results are compared to those from other variants and other methods in the literature. The paper includes six main parts: introduction, wind farm, ED with WF, CSA, results and comparison and conclusion.

Wind Turbine and Wind Farm

Almost wind turbines work in a wind speed area which show on Figure 1 [13,14]. If wind speed under Vcut-in or over Vcut-out the wind turbine stop work because wind speeds are slow or too fast. Working wind speeds of wind turbine are from 5 m/s to 25 m/s. Following Figure 1, Vrate = 5 m/s - 25 m/s.

global-journal-technology-optimization-Working-wind-speed-wind-turbine

Figure 1: Working wind speed of wind turbine.

Wind farm includes many wind turbines which connect together and output electricity to power sysetm. A wind farm can performances on Figure 2 below.

global-journal-technology-optimization-Wind-farm-performance

Figure 2: Wind farm performance.

Probability of wind speed and wind power

Wind speed was collected by 24 hours on a day in many years. From this data, wind speed can calculate about average value, standard deviation and wind speed probability.

The average value [15-17] of wind data calculate by below formula:

image(1)

The standard deviation [15,16] of wind data can be as following:

image(2)

From the average value and standard deviation, probability of wind speed of history data define by [15,16]:

image(3)

With:

k: A time measure wind speed (h).

vl: Wind speed at k (m/s).

Sli: Wind speed history data.

μ: Wind speed average value.

σ: Standard deviation.

PRvi: Wind speed probability.

Wind turbine power is calculated by formula,

image(4)

Where:

ρ: Air density (kg/m3).

A: Total area wind though propeller of wind turbine (m2).

Cp: Rotor efficient.

vlmin: Wind speed minimum.

vlmax: Wind speed maximum.

v: Wind speed (m/s).

Fw: wind power, Fw = 1/2.ρ.A.Cp

The probability of wind speed is demonstrated by the chart in Figure 3.

global-journal-technology-optimization-Probability-wind-speed

Figure 3: Probability of wind speed.

Wind power cost

Cost of wind power differs with other energy cost, wind power investment cost higher than operation and maintenance cost. Following [13] average wind power cost ($/kWh) include many elements below formula,

image(5)

With:

COE: Average wind power cost ($/kWh).

ICC: Install capacity cost ($).

FRC: Interesting rate cost (%/year).

LRC: ($/year).

O&M: Operation and maintenance cost. ($/kWk, $/MWh).

AEP: Annual total wind power out put (kWh/year).

Following [14] operation and maintenance cost of wind power is from 0.005 to 0.007 $/kWh. Therefore, wind power cost can calculate by combination (4) and (5),

image(6)

Economic Dispatch with Wind Farm

Thermal turbine

Consider Power system with all thermal power generation, the total cost of power plants is sum of the cost of each generator can formulated as follows [5],

image(7)

Where:

CTG: Cost of thermal generator.

Economic dispatch with wind farm

Economic dispatch is more different and complex when wind farm embark in to the system with many constraints about cost and power output. The target of economic dispatch system with wind farms is minimum the cost of operation, total output power capacity of each generation and many system constraints. In this paper, some main constraints are interested such as power balance, power loss and generator limits.

Mathematically, the problem ED with WF is formulated as follows:

image(8)

Power balance: The total power generation from the online generating units must satisfy the load demand plus power loss,

(9)

The power loss PL can be approximately calculated using B-coefficients based on the power flow solution,

image(10)

Generator limits: The real power output Pgi of unit i should be limited between its upper and lower bounds for safety operation represented by:

Thermal generators limits:

image(11)

Wind farm power limits:

image(12)

Productive power of a wind turbine normal is 1.5 MW to 2.5 MW [14], average installation and operation cost of a wind turbine give on Table 1.

IEEE 30 buses system data Total Bus No.
Generators 7 1, 2, 5, 8, 11, 13,22
Transformers 4 6-9, 6-10, 4-12, 27-28
Capacitor banks 9 10, 12, 15, 17, 20, 21, 23, 24, 29
Tap changers 4 4, 6, 10, 28
Branches 41 From 1 to 30
Loads 24 3, 4, 6, 7, 9, 10, 12, 14 to 30

Table 1: IEEE 30 bus system data.

Cuckoo Search Algorithm (CSA)

Cuckoo search is a new meta-heuristic algorithm inspired from the nature for solving optimization problems. The basic idea of this algorithm is based on the obligate brood parasitic behavior of some cuckoo species in combination with the Lévy flight behavior of some birds and fruit flies. There are three idealized rules for the new cuckoo search algorithm (CSA) described as [15].

Each cuckoo lays one egg (a design solution) at a time and dumps its egg in a randomly chosen nest among the fixed number of available host nests;

The best nests with high a quality of egg (better solution) will be carried over to the next generation;

A host bird can discover an alien egg in its nest with a probability of pa∈[0,1]. In this case, it can simply either throw the egg away or abandon the nest and find a new location to build a completely new one.

The Lévy flight distribution

In nature, animals can search for food in a random or quasi-random manner. Generally, the foraging path of an animal is effectively a random walk since the next move is based on the current location state and the transition probability to the next location. The chosen direction depends implicitly on a probability which can be mathematically modeled. Recent various studies have shown that the flight behavior of many animals and insects has demonstrated the typical characteristics of Lévy flights following formula:

image(13)

CSA application for ED problem with WF

The fitness function of ED problem is,

image(14)

Overall procedure of CSA for ED problem following as steps:

Step 1: Choose bird nests Np, parameters of CSA: Ub, Lb, pa, ITmax, total generators N include cost function parameters ai, bi, ci, ei, fi. Set up initial variables Xid such as power output of thermal and wind generation corresponding number of cuckoo eggs in a nest.

Step 2: Choose Xid random. Use Matpower 4.1 Toolbox to calculate:

Value objective function FC.

Value of fitness function FFinf.

Step 3: Apply Lévy flights distribution to choose the eggs of cuckoo corresponding with Xid. Calculate FFinf following (14). From these results, calculate new value of fitness function FFnew following (14).

Step 4: Assess the quality of initialized cuckoo eggs.

If FFnew>FFinf reject initialized eggs.

If FFnew<FFinf continue to run iterations and reject number of eggs with pa probability.

Step 5: From pa rejected eggs, calculate fitness function FFdis.

Step 6: Continue program to maximum iteration ITmax, compare and assess value of FFnew and FFdis, choose the eggs with the best quality corresponding power output of generators with minimum FFvalue.

Step 7: Diagram characteristic of FF with each iteration.

Step 8: Show result of problem: Pgi, Pwgi, iterations, programming time of computer.

Numerical Results

Testing system data

The CSA for ED problem is tested on IEEE 30 buses system and Matpower 4.1 toolbox [18,19]. Target of problem is minimum operation cost with the best power out of thermal and wind generation. Total load demand is 289.3 MW and 189.3 MW. The data of IEEE 30 buses follow on Table 1.

History wind data vary following different areas and defence many conditions such as weather, location, terrain and high level. Almost wind farms, the history wind data will be supplied by proficient meteorological companies. Therefore, the research computes programming with wind speed scenarios which help to calculate wind turbine power output. Moreover, wind turbine capacity is produced from 1 MVA to 2.5 MVA, the research chooses each wind turbine capacity 2.5 MVA, wind farm include 50 wind turbines. The WF connects as 22nd bus and its total power capacity is 125 MVA. Normally, wind speed from 5 m/s to 25 m/s at wind farm location which is equivalent output power from 12.5 MVA to 112.5 MVA. Following previous researches [20-22], the research select two scenarios suitable with wind turbine power production and parameters of previous research.

Scenario 1: Load demand is 289.3 MW and WF power is 100 MVA.

Scenario 2: Load demand is 189.3 MW and WF power is 16 MVA.

Program used computer with processor 2.70 GHz, memory RAM at 8GB and Matlab software 2012b. The program also used Power Toolbox 4.1 to run ED problem with WF connecting by CSA method.

Following standard functions testing, CSA parameters set at Np =15, Pa = 0.25, K=1e6 and ITmax= 100, the program run twenty times and get the best value after program closing. The program also calculates standard deviation of the best results after twenty times running for CSA assessment with ED problem and best results selection.

Program results

Following the system data, the program has results each scenario with different load demand and total power of wind farm. Figures 4 and 5 show the best slope down of graph after twenty times running, it proves that CAS can solve ED & WF problem with the best result and good converging roots. Moreover, the result also has short time programming and small standard deviation value.

global-journal-technology-optimization-Characteristic-scenario

Figure 4: Characteristic scenario 1 of ED with WF by CS.

global-journal-technology-optimization-Standard-deviation-scenario

Figure 5: Standard deviation scenario No. 1 by CS with 20 programming.

The scenario 1 and scenario 2 results of CSA for ED problem with WF are showed on Table 2, Figures 4-7 below.

global-journal-technology-optimization-Characteristic-scenario

Figure 6: Characteristic scenario 2 of ED with WF by CS.

global-journal-technology-optimization-Standard-deviation-scenario

Figure 7: Standard deviation scenario No. 2 by CS with 20 programming.

  Scenario 1 Scenario 2
Pg1 (MW) 115.7674 94.7986
Pg2 (MW) 33.3536 35.0555
Pg3 (MW) 15.0000 15.0169
Pg4 (MW) 10.0098 10.0000
g5 (MW) 10.0000 10.0000
Pg6  (MW) 12.0010 12.0076
Pwind  (MW) 100.0000 15.9674
PD  (MW) 289.3 189.3
Cost  ($/h) 494.0327 439.9149
Std 1.1175 0.8580
Iterations 100 100
Pro-time  (s) 45.482 19.385

Table 2: Results of ED problem with WF by CSA.

Results comparison

Table 2 and Figures 4-7 shows that CSA can calculate power output of thermal generators and wind farm in the system with minimum operation cost. The power output of power plants ensure to supply for loads and balance for system. Root converging of optimization ED problem is good slope after several iterations that mean CSA can be the best method for optimization problem solution.

From results by 5.2, CAS can solve ED problem with WF, CAS and Matlab software combination can run the program effective, give accurate results and fast time. From Table 2 and previous research [20-22], result comparison perform on Table 3 which give detail power output value of thermal generations and wind farm.

  MBO
[20]
CS
Scenario 1
LP
[21]
CS
Scenario 2
Pg1 (MW) 48.45 115.7674 45 94.7986
Pg2 (MW) 34.44 33.3536 60.9 35.0555
Pg3 (MW) 30.43 15.0000 15 15.0169
Pg4 (MW) 29.07 10.0098 21 10.0000
P­g5 (MW) 16.12 10.0000 16 10.0000
Pg6 (MW) 28.61 12.0010 39.89 12.0076
Pwind (MW) 99.73 100.0000 16 15.9674
PD  (MW) 289.3 289.3 189.3 189.3
Cost  ($/h) 514 494.0327 450 439.9149
Std - 1.1175 - 0.8580
No. of iterations - 100 - 100
Pro-time  (s) - 45.482 - 19.385

Table 3: Results comparison between the methods.

From Table 3, the CSA has advance points more than other methods MBO and LP because CSA give minimum cost of system operation with WF. Two methods MBO and LP have not the time programming and standard deviation. The cost of CSA are 494.03 $/h and 439.91 $/h which under two cost values of MBO and LP methods. Standard deviation of scenario No.2 is 0.8585 that show small deviation between many runs. The cost values and small deviation of CSA prove CSA is the best method to solve ED problem with WF. It can apply in larger power system with WF connecting in future.

Conclusion

From above results, CSA can solve ED problem with WF connecting by shortest CPU time and give the best result. Although other method improvement has new solution, their value results is higher and long CPU time.

There are some artificial algorithms which solve ED problem in power system operation. However, CSA is best method because it can quickly give exact results. Especially, when power system has WF jointing that change many important results such as operation cost and power output of generations. Although WF has operation and maintenance cost but operation cost of system reduces when the system has WF connecting [2,22,23].

In the future, the power system becomes more complicated when the system connects with WFs or other renewable energy such as solar, tide and wave power. ED problem in power system should be concern more about cost optimization that need mathematical methods help to solve ED problem with big power system.

From the research result of this paper, CSA can solve ED problem with WF connecting in power system for the best results about time programming and minimum operation cost. So CSA can be very useful and perfect method in power system calculations and CSA can apply to calculate large power system more generators, loads and other constraints of other power system in future.

References

Select your language of interest to view the total content in your interested language
Post your comment

Share This Article

Recommended Conferences

Article Usage

  • Total views: 536
  • [From(publication date):
    December-2016 - Sep 26, 2017]
  • Breakdown by view type
  • HTML page views : 447
  • PDF downloads :89
 

Post your comment

captcha   Reload  Can't read the image? click here to refresh

Peer Reviewed Journals
 
Make the best use of Scientific Research and information from our 700 + peer reviewed, Open Access Journals
International Conferences 2017-18
 
Meet Inspiring Speakers and Experts at our 3000+ Global Annual Meetings

Contact Us

Agri, Food, Aqua and Veterinary Science Journals

Dr. Krish

[email protected]

1-702-714-7001 Extn: 9040

Clinical and Biochemistry Journals

Datta A

[email protected]

1-702-714-7001Extn: 9037

Business & Management Journals

Ronald

[email protected]

1-702-714-7001Extn: 9042

Chemical Engineering and Chemistry Journals

Gabriel Shaw

[email protected]

1-702-714-7001 Extn: 9040

Earth & Environmental Sciences

Katie Wilson

[email protected]

1-702-714-7001Extn: 9042

Engineering Journals

James Franklin

[email protected]

1-702-714-7001Extn: 9042

General Science and Health care Journals

Andrea Jason

[email protected]

1-702-714-7001Extn: 9043

Genetics and Molecular Biology Journals

Anna Melissa

[email protected]

1-702-714-7001 Extn: 9006

Immunology & Microbiology Journals

David Gorantl

[email protected]

1-702-714-7001Extn: 9014

Informatics Journals

Stephanie Skinner

[email protected]

1-702-714-7001Extn: 9039

Material Sciences Journals

Rachle Green

[email protected]

1-702-714-7001Extn: 9039

Mathematics and Physics Journals

Jim Willison

[email protected]

1-702-714-7001 Extn: 9042

Medical Journals

Nimmi Anna

[email protected]

1-702-714-7001 Extn: 9038

Neuroscience & Psychology Journals

Nathan T

[email protected]

1-702-714-7001Extn: 9041

Pharmaceutical Sciences Journals

John Behannon

[email protected]

1-702-714-7001Extn: 9007

Social & Political Science Journals

Steve Harry

[email protected]

1-702-714-7001 Extn: 9042

 
© 2008-2017 OMICS International - Open Access Publisher. Best viewed in Mozilla Firefox | Google Chrome | Above IE 7.0 version
adwords