Make the best use of Scientific Research and information from our 700+ peer reviewed, Open Access Journals that operates with the help of 50,000+ Editorial Board Members and esteemed reviewers and 1000+ Scientific associations in Medical, Clinical, Pharmaceutical, Engineering, Technology and Management Fields.
Meet Inspiring Speakers and Experts at our 3000+ Global Conferenceseries Events with over 600+ Conferences, 1200+ Symposiums and 1200+ Workshops on
Medical, Pharma, Engineering, Science, Technology and Business

Municipal Solid Waste Landfills Construction and Management-A Few Concerns

PV Sivapullaiah, BP Naveen* and TG Sitharam

Department of Civil Engineering, Indian Institute of Science, Bangalore, India

*Corresponding Author:
B.P. Naveen
Professor, Department of Civil Engineering
Geotechnical Division, Indian Institute of Science
Bangalore, Karnataka 560012, India
Tel: +919916232349
Fax: +91-80-23600404
E-mail: [email protected]

Received Date: Mar 30, 2016, Accepted Date: Apr 25, 2016, Published Date: May 02, 2016

Citation: Sivapullaiah PV, Naveen BP, Sitharam TG (2016) Municipal Solid Waste Landfills Construction and Management-A Few Concerns. Int J Waste Resour 6:214. doi:10.4172/2252-5211.1000214

Copyright: © 2016 Sivapullaiah PV, et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

Visit for more related articles at International Journal of Waste Resources

Abstract

In Bangalore city, one of the major problems is municipal solid management (MSW) due to ever increasing waste quantity along with its changing waste characteristics. Municipal solid waste includes non-hazardous waste generated in house, institutions, commercial and business establishments in an urban area. As city grow and produce more municipal solid waste and their waste collection systems become more efficient, due the environmental impact from dump site becomes increasingly intolerable. A report on waste management prepared for the Government of India (1998) by a sub-committee of the Supreme Court describes this as a serious situation. The municipal bodies in Bangalore have been unable to manage the rapid changes that have led to both increased waste quantities and changes in the waste composition this leading to an over-loading of the service. MSW rules do not permit to dump mixed waste in direct land filling and hence, the waste needs to be segregated in order to collect and reuse all recyclable and the organic matter needs to be stabilized. The generated and collected MSW needs to be processed/ treated with only non-biodegradable MSW and the rejects of the processing facility being dumped in landfill. Leachate emanating from solid waste deposited in landfill possess dissolved or an entrained environmentally harmful substances. Generally, environmental impacts and economic damages of poor leachate management practices on groundwater and receiving surface waters are not clearly understood. With this context, this study, the concept of leachate pollution index, a tool for quantifying the leachate pollution potential and water quality index for surrounding water bodies of Mavallipura landfill site in Bangalore has been applied. It has been found that the leachate generated from the Mavallipura landfill site has high contamination potential to the surrounding water bodies. The results revealed that quality of ground water resources in Mavallipura landfill is deteriorating largely, as a result of the poor practice of solid waste management. Hence, an effective remedial plan needs to be prepared for the sustainable water quality maintenance of the area.

Keywords

Leachate; Leachate pollution index; Landfill; Water quality index; Solid waste

Introduction

Solid Waste Management is a very complex common problem in both developing and developed countries. Improper waste management can generally lead to transmission of illnesses, direct risks to those who contact with garbage, indirect risks of proliferation of animals that are carriers of microorganisms, aesthetic deterioration, degradation of the natural landscape, water, soil and air pollution. Improper management in developing countries results in dirty public areas, waste recovery in the streets, dumping of garbage into streams and rivers, or open dumps leading to men, women and children wade through the waste subjecting all of them to all kinds of diseases and accidents. The problem is aggravating due to rapid population growth, industrial development and changing eating habits and wide spread use of disposable containers.

Bangalore is the capital of Karnataka state in the south of India and one of the fastest growing metropolis in south asia, with a population of about 10 million in 2015. Bangalore generates around 4500 tons per day at the rate of 500 gm/capita/day, and most this is illegally dumped in the peri urban areas of the city. About 20 kms north of Bangalore city, close to Yelahanka town and the Yelahanka air force base, there is a village called Mavallipura. With the approval of Bangalore Mahanagar Palike, since May 2003 the everyday, about 200 truckloads of municipal solid waste from the northern ward of Bangalore are being disposed on 20 acres of open land belonging to Mr. Bylappa from Mavallipura. Due to open dumping, over the years all drinking waters sources in the vicinity have been adversely affected and contaminating the Arkavathy river. This river basin is located in the Mavallipura landfill are just 2.5 km away from the flow of river Arkavathi. It is also 5 km from the air base.

Description of Mavallipura Landfill Site

The landfill is situated at survey no.108, at Mavallipura village, Hesaragatta zone, Bangalore North, Karnataka state. The landfill site is located in the north of Bangalore, India at Latitude 13°50’ North, Longitude 77°36’ East in the state of Karnataka. This landfill site has been used as a processing site for the municipal solid waste generated from the Bangalore city. Bangalore receives the average annual rainfall is 978 mm. Primary rainy seasons is from June to September and the secondary rainy season is from November to December. Mavallipura village is located about 20 Kilometer away from Bangalore. About 100 acres of land in and around the village are used for dumping Bangalore's municipal waste by the Bruhat Bangalore Mahanagara Palike (BBMP– Greater Bangalore Municipal Corporation) that began accepting waste from 2005. The landfill was operated by M/s Ramky Environmental Engineers opened in 2007 can sustain about 600 tonnes of waste. However, the BBMP has been sending almost 1,000 tonnes of garbage from Bangalore city every day. But it is only able to process 250 tonnes. Citizens around Mavalipura village demand that the landfill site must be stopped immediately as it is illegal and unscientifically managed, and thus it is now closed for land filling. A little soil cover (0.3 m thickness) has been applied historically, and MSW is deposited in an unscientific manner that has resulted in steep, unstable slopes, leachate accumulation within the MSW mass, and leachate runoff into nearby water bodies such as pond and opened well. Mavallipura landfill site is about 40.48 hectares located in Mavallipura village, of which approximately 35 acres is used for landfill. Figure 1 shows the Google map with area map of Mavallipura landfill dump site. The features of the site are given in Table 1.

Features Details
Latitude and Longitude Latitude 13°50’ m North
Longitude 77°36’ East
Mean elevation of the site Ranging from 51.38m to 38.65m above MSL
Land area 40.49 hectares
Land use Barren
Nearest highway 7.5km away from the Nation highway No.7 connecting Mangalore to Chennai
Access Road Approach road to the site is well developed
Water bodies and dams Hessargatta water tank-5.5km
Reserve forests, Ecological zones, Monuments, railway station, major settlement None within 10 km
Socio economic Agriculture based
Minor settlement Mavallipura village within  3km
Airport Bangalore airport more than 30km
Deccan aviation centre at 8km

Table 1: Mavallipura site Features [1].

Waste-Resources-map-Mavallipura-site

Figure 1: Area map of Mavallipura site.

Plan of the Landfill

The landfill has 3 cells at present. Cell 1 is completely filled and covered by a HDPE membrane. Cell 1 is spread around 5 acres. Cell 2 and 3 operational at present. A single liner system is used since this is not a hazardous waste landfill. The leachate collection system present outside the landfill (Figure 2).

Waste-Resources-landfill-Plan

Figure 2: Mavallipura landfill Plan showing Leachate Network.

The moisture content of the waste is around 40-50%. The MSW waste is dumped in the landfill in layers of 1-3 m. The limited waste lifts to approximately 2-3 meters had limited tipping fronts, were equipped with compaction machinery and bulldozers, and tracked waste accepted for landfilling. Waste pickers access to recyclable materials before solid waste arrived at the landfill site. There are leachate collection sumps for the collection of the leachate. High- Density Polyethylene Pipe (HDPE) pipes are used for the collection of the leachate. It is laid at a slope of 1:2. These pipes are connected to the leachate collection sumps. The capacity of the sump is 2 lakh kilo litres. It is found that the leachate generated during the rainy season is 5 lakh per day. 30 kilo litres per day of leachate are taken to the leachate treatment facility and the liquid waste coming out of the treatment plant is taken to the solar evaporation ponds. The landfill provided five solar evaporation ponds, they are not scientific related to the depth, and is filled with leachate effluents.

Infrastructure Development for the Landfill

In the Mavallipura landfill the following site infrastructure is provided:

Site entrance infrastructure included

Permanent, wide, entrance road with specific entry and exit lanes and gates.

Sufficient parking inside the entrance gate till the weighbridge to avoid queuing of vehicles outside the gate.

Proper direction signs and lighting at the gate.

Entrance area with a green belt of 20 m containing tree plantation.All around the landfill site with lockable gates to prevent unauthorised access and a perimeter fencing of at least 2 m height.

Full time security guard at the site.

Two weigh bridge of 50 T capacity (entry and exit) with office.

Administrative office: 30 m × 10 m building.

Site control office: 3 m × 5 m.

Wastes Processing

The wastes are brought to the site and dumped temporarily. The waste is undergoes a number of processes before being taken to the landfill. Pre processing operations are carried out in order to separate the plastics and the recyclables. Windrow composting is done and the temperature is monitored. The detailed flowchart showing the operations is given in Figure 3.

Waste-Resources-present-practice-MSW

Figure 3: Schematic representation of the present practice of MSW in Bangalore.

Windrow Composting

Municipal Solid Waste (MSW) received at compost plant is a mixture of decomposable material with plastic, metal, glass, sand and other non-biodegradable material. MSW is first received in preprocessing area of the plant. In this phase, large size objects such as tires, cans, glass articles, metals are manually (hand picking) is done. Composting yard plan is shown in Figure 4.

Waste-Resources-Composting-yard-plan

Figure 4: Composting yard plan.

This preprocessed MSW is then shifted to composting pad for decomposition by making windrows. Composting culture is sprayed on this waste and each windrow is turned frequently to maintain aerobic conditions for composting with maximum speed. Composted MSW is then shifted to coarse segregation area having mechanical arrangements to segregate the rejects like plastic, cloth, metals, glass of the size above 14 mm using rotary screen (trommel) of 35 mm and 15 mm sizes. Feeder, hopper and conveyer belts are provided with trommel for taking away rejects and semi-finished compost separately. Above semi-finished compost is then further shifted to curing section for further digestion. After curing, compost is shifted to refinement section which consists of vibratory screen or trommel of 4-6 mm size. Disposal of reject material (Rejects like gravels, sand, stones, glass, metal and other inert materials above 4 mm are separated in this section). This reject material goes to landfill.

Landfill Design

The landfill designer must address is whether the unit will be above or below ground. Above ground disposal is particularly attractive for sites with shallow water tables. Above - ground landfills have the advantage that leachate can be drained by gravity, the facility is conspicuous and not easily forgotten or ignored, and construction of liner and drainage system components occurs on more or less level ground, which simplifies construction. Vertical expansions of existing facilities essentially constitute above-ground landfill.

Disposal units that are partly below ground have the advantage of allowing more waste to be disposed of in a given area, offer more efficient use of construction materials and potentially could allow for productive use of the land if the final surface is relatively flat. Several systems can be employed to control release of waste constituents. The primary objectives of control systems are:

(i) To minimize infiltration of water into waste through the cover or side walls of the facility.

(ii) To collect and remove gas and leachate, and

(iii) To minimize release of leachate to the subsurface.

The individual containment cells must be properly sized, and appropriate quantities of soil cover must be made available to minimize leachate formation and transport through the landfill.

Landfill Capacity

The perimeter of the dumpsite is 867 m, and it encloses an area of 46,801 m2 or 4.68 hectares (Figure 5). The average height of the dumpsite from ground level is 7.5 m and the known average depth 6 m. The total vertical depth of the site is therefore 6 m, and the total volume of the waste approximately 280,800 m3. The average density of the wet waste is 0.685 kg/m3. Based on the contour map, the average vertical depth of the landfill is 13.5 m and the total volume of the waste approximately 631,800 m3.

Waste-Resources-dumpsite-indicated

Figure 5: The perimeter of the dumpsite indicated on a google earth image of the site.

Phased Operation

Phase’s operation consists of cells, lifts, daily cover, intermediate cover, liner and leachate collection facility, gas control facility and final cover over the sub-area.

Generally in each phase is typically designed for a period of 12 months. In each phase are filled from the base to the final/ intermediate cover and capped within this period leaving a temporary unstored sloping face.

Soil Cover Details

The waste is simply brought and dumped in the landfill, spread in layers of about 0.3 m thickness, and compacted. Another layer of 0.3 m thickness is then placed on top of the previous layer and also compacted. Layering and compacting are repeated until a height of about 1.5 m is reached. At this point and the end of a working day, a cover of earth of about 0.3 m thickness is compacted on the top and side slopes of the compacted heap, which is called a soil cover (Figure 6).

Waste-Resources-construction-procedures

Figure 6: Typical construction procedures of soil cover.

The final cover for the landfill must minimize infiltration of surface water, prevent runoff contamination, and generally maintain the integrity of the hazardous waste landfill over the entire post closure period. Nearly all engineered cover systems (except perhaps those at arid sites) have a barrier layer . The barrier layer is generally either a single geomembrane, a layer of low-hydraulic-conductivity compacted soil, or a composite geomembrane-soil liner.

Closure

Proper planning greatly reduces the possibility of later adverse environmental problems. The goal should be to provide a site during the postclosure period that is environmentally acceptable.

Liner system

Liner system comprise of a combination of leachate drainage and collection layer and barrier as shown in Figure 7. A competent liner system should have low permeability, should be robust and durable and should be resistant to chemical attack, puncture and rupture.

Waste-Resources-Liner-system

Figure 7: Liner system at base and side of landfill.

The clay liner thickness at base of Mavallipura landfill is 1 m. The permeability of the clay liner is < 1 × 10-9 cm/s. The clay liner is placed in layers not exceeding 300 mm and then compacted to the desired permeability and raised to a total thickness of 1 m. The top of the clay liner, as well as the base of the landfill is effectively graded to attain a clear slope of 2% towards the leachate collection sump.

The liner system adopted at any landfill must satisfy the minimum requirements published by regulatory agencies (MOEF/CPCB). Generally it is recommended that for all MSW landfills the following single composite liner system be adopted as the minimum requirement.

A leachate drainage layer 30 cm thick made of granular soil having permeability greater than 102 cm/sec.

A protection layer of silty soil, 20 cm to 30 cm thick.

A geomembrane of thickness 1.5 mm or more.

A compacted clay barrier of 1 m thickness having permeability of less than 10-7 cm/sec

Leachate Collection and Management

For maintaining the effective leachate collection, the leachate collection pipes are embedded in a drainage media. The drainage media shall be also flow into the leachate collection sump. A geo-textile barrier is placed over the drainage media to ensures that the drainage media does not get choked and thus also ensure only the liquid percolation into the drainage.

Generally, landfill leachate mainly constituent of large amount of organic matter such as chemical oxygen demand and total organic carbon; as well as ammonia nitrogen, heavy metals like copper, zinc, iron, lead manganese etc, chlorinated organic and inorganic salts, which are a great threat to the surrounding soil, groundwater and even surface water [2,3]. All these factors make leachate treatment more difficult and complicated. The various methods are in use to treat the landfill leachate. Most of these methods are adopted for waste treatment processing and can be divided into major two categories namely: physical/chemical and biological treatment methods.

At present, in Mavallipura landfill leachate is treated by reverse osmosis process (Figure 8). This treatment is inexpensive system featuring disposable membranes that effectively capture the nutrients in leachate, separate out heavy metals and volatile organic compounds (VOCs), remove water from the landfill cell, and treat the water for reuse. The resulting byproducts make suitable fertilizers.

Waste-Resources-Reverse-osmosis

Figure 8: Reverse osmosis process carried out in landfill.

The system, comprised of membranes, pipes, pumps, treats leachate on site with minimal startup costs, energy consumption, odor and environmental damage.

Landfill gas collection system

Daily and intermittent soil covers shall be placed over the municipal solid wastes on a daily basis to ensure that odor generation is minimized. This soil covers also acts as a barrier thus providing for fire protection and effective movement of waste dumping trucks into the landfill. Before landfill capping, the vents and gas collection system shall be fitted to ensure that any gas generated in the landfill shall be effectively collected. The collected gas can be utilized for energy recovery.

Surface water drainage system

Collects and removes all surface runoff from the landfill site. Surface water drain: Adjacent to arterial road along periphery.

Environmental monitoring systems

The ground water monitoring system is present. There are 4 monitoring wells inside the site boundary which are monitored weekly and 6 monitoring wells situated away from the boundary which are monitored monthly. Ambient air quality monitoring is done monthly. Soil tests are done periodically.

Water bound macadam road

Main Access Road is 7 m wide, from main road to parking area after weigh-bridge and arterial Road is 3.5 m wide all along the periphery.

Water bound macadam road in landfill consists of following specifications are:

Sub-base: The formation level of the road the first layer is called sublayer. Its material consists of a different quality than the base material. Its main objective is to protect the sub grade from the possibilities of getting damage during construction work.

Base: In this material layer consists of soil. This soil may be stone dust is the presence of moisture or soil made by another process. The thickness of each compacted layer of WBM ranges from 10cm to 7.5cm depending on the size and the gradation of aggregate used. Its main objective is to transfer the traffic load uniformly on the soil.

Upper layer: This is final layer called surfacing, which is made by stone chips that are compacted by water (Figure 9). This gets broken during the traffic moves, and it can be easily repaired without removing the lower layers (Figure 10).

Waste-Resources-WBM-road-construction

Figure 9: WBM road construction in landfill site.

Waste-Resources-Sample-locations-points

Figure 10: Sample locations points.

Influence of leachate migration on ground water quality

Figure 10 shows sample location points in landfill. The samples were collected in labeled clean bottles that were rinsed thrice before sample collection. The pH and electrical conductivity (EC) were recorded on site at the time of sampling with digital pH meter and digital EC meter, respectively. For the analysis of biological oxygen demand (BOD), 300 ml capacity BOD bottles were used for the collection of samples. For heavy metal analyses, samples were separately collected in pre-washed polyethylene containers of 100 ml capacity and acidified (few drops of concentrated nitric acid were added to the leachate sample) onsite to avoid precipitation of metals. The samples were then transported in cooler boxes at a temperature below 5°C and transported immediately to the laboratory. A sample of leachate were stored in a refrigerator at 4°C before proceeding with the analysis and during laboratory analysis various ionic parameters were analysed. Later ion balance and quality assurance were also undertaken that is discussed in the subsequent sections of this chapter. The analysis is carried out according to standard methods for the examination of water and wastewater unless otherwise stated APHA [4].

Results and Discussion

Table 2 shows the results the chemical characteristics of the leachate from Mavallipura landfill. As for metals, high concentrations of iron in the leachate, followed by zinc, nickel were observed. The concentrations of chromium, copper, cadmium and lead were low.

Details Leachate Pond Well
   (Sample-1) (Sample -2) (Sample- 3)
pH 7.4 8.4 7.5
Conductivity, µS/cm 4120 2500 1362
TDS, mg/l 2027 1447 703
COD, mg/l 10400 1080 440
BOD3 , mg/l 1500 105 3
Sulphate, mg/l 40 10 7
Chloride, mg/l 660 250 230
Calcium, mg/l 400 0 320
Alkalinity, mg/l 11200 2000 300
Iron, mg/l 11.16 0.16 0.62
Copper, mg/l 0.151 BDL BDL
Silver, mg/l 0.035 0.026 0.051
Chromium, mg/l 0.021 BDL BDL
Cadmium, mg/l 0.035 BDL BDL
Lead, mg/l 0.3 BDL BDL
Zinc, mg/l 3 1 0.4
Nickel, mg/l 1.339 BDL BDL
Sodium, mg/l 3710 1676 88
Potassium , mg/l 1675 1078 46
Nitrate, mg/l 22.36 0.18 1.09
Total Phosphorus, mg/l 26.29 5.87 1.5

Table 2: Leachate characteristic of Mavallipura landfill.

Leachate (sample-1); pond water (sample-2) and open well – groundwater (sample-3) collected from different locations were analyzed for various physicochemical parameters. High concentration of organic and inorganic constituents were recorded that were beyond the permissible limits [5]. While, varied heavy metals levels were observed in the collected samples. Iron followed by zinc and nickel dominated among the metals analysed, wherein chromium, copper, cadmium and lead values were relatively lower. BOD5 to COD ratio revealed medium aged leachate samples (5 to 10 years). Total dissolved solids and electrical conductivity were found to be very high. Major anions like chloride is one of the most important parameters in assessing the water quality. The higher concentration of chlorides indicates a higher degree of organic pollution. The concentration of dissolved oxygen indicates the distribution of flora and fauna. Biochemical oxygen indicates the organic load in a water bodies. Higher BOD values are found in the polluted water.

The results revealed that quality of ground water resources in Mavallipura landfill is deteriorating day by day; largely as a consequence of the poor practice of solid waste management. Hence, an efficient precautionary plan is required for the sustainable management, which can be used as a guide for the regulation and supervision of ground water operations.

Leachate Pollution Index Concept

LPI provides an efficient method for evaluating the leachate contamination potential. The leachate pollution index (LPI) and it is formulated based on the Delphi technique. The LPI is a quantitative tool by which the leachate pollution data of the landfill sites can be reported uniformly. LPI formulation process involves selecting variables, deriving weights for the selected pollutant variables, formulating their sub indices curves, and finally aggregating the pollutant variables to arrive at the LPI [6] (Table 3).

Pollutant, mg/l Sample-1 Wi  Pi   (PiWi)
pH 7.4 0.055 5 0.275
TDS 2027 0.05 8 0.4
BOD5 1500 0.061 55 3.36
COD 10400 0.062 80 4.96
TKN 2330 0.053 95 5.035
Ammonia Nitrogen 1803 0.051 100 5.1
Iron 11.16 0.044 5 0.22
Copper 0.151 0.05 5 0.25
Nickel 1.339 0.052 5 0.26
Zinc 3 0.056 5 0.28
Lead 0.3 0.063 5 0.31
Chromium 0.021 0.064 10 0.64
Chlorides 660 0.048 5.3 0.2544
Final LPI value   30.10

Table 3: LPI for the landfill leachate.

LPI values were calculated for leachate sample of Mavallipura site. Table 3 show the calculations for LPI values of leachate samples in Mavallipura landfill site. The results indicate that the leachate sample has high LPI value and therefore, it has relatively more contamination potential. Mavallipura leachate sample can therefore pose threat to the environment and human health and hence, measures and continuous monitoring must be ensured.

Ground Water Quality

Water Quality Index is calculated based on important 13 parameters. By using standards of drinking water quality recommended by the BIS, ICMR, WHO. The unit weight arithmetic index was used from [7] for the calculation of WQI of the water body, Further; quality rating of sub index (qn) was calculated using the following expression.

equation (1)

qn = Quality rating for the nth water quality parameter

Vn = Estimated value of the nth parameter at a given sampling station

Sn = Standard permissible value of the nth parameter.

Viw = Ideal value of nth parameter (i.e. zero for all parameters except the pH and Dissolved oxygen (7 and 14.6 mg/L respectively).

Water Quality Index was calculated by cumulative the quality rating with unit weight linearly.

equation (2)

Tables 4 show the calculations for WQI values of pond & well water sample near the same landfill area.

Parameters Unit weight Pond sample WQI Well sample WQI
pH 0.219 8.4 20.44 7.5 7.3
EC 0.371 2500 309.17 1362 168.4
TDS 0.0037 1447 1.07 703 0.52
Total alkalinity 0.0155 2000 25.83 300 3.875
Total hardness 0.0062 1500 3.1 1000 2.067
TSS 0.0037 1697 1.26 1384 1.02
Calcium 0.025 0 0 320 10.67
Magnesium 0.061 1500 305 200 40.67
Chlorides 0.0074 250 0.74 230 0.68
Nitrate 0.0412 0.18 0.02 1.09 0.09
Sulphate 0.01236 10 0.08 7 0.057
Dissolved oxygen 0.3723 2.7 20.1 2.1 72.97
BOD 0.3723 105 338.83 3 62.05
Total   WQI =678.94   WQI =370.37  

Table 4: WQI for the landfill pond & well samples.

Water quality index of the present water body is established from important various physicochemical parameters. The values of various physicochemical parameters for calculation of water quality index are presented in Table 4. Based on the Chatterjee [7] this water quality rating study clearly shows that, the status of the water body is eutrophic and it is unsuitable for drinking and also observed that the pollution load is relatively high. It can be inferred easily that this is due to contamination of ground and surface water bodies near landfill site is due their contamination by migrating leachate. Again this may be due to seepage through improper barrier system laid or over follow or by both. In additional, the water bodies in the area are severely polluted and untreated leachate was found overflowing into storm water drains and also remained stagnant in open land.

Recommendation and Protection Measures

Voluminous generation of leachate could be minimized by restricting water flow into the landfill through surface water diversion and reducing water accumulation in these landfill sites by frequent pumping in addition with laying soil cover on a day to day basis. A low-permeability cover aids in restricting water infiltration into the landfill area. For suitable management of leachate effective containment of leachate with improved collection facilities are necessary [8].

Leachate produced during the landfill process has to be meticulously collected and treated with advanced microbial technologies as anaerobic baffled reactors, anaerobic filters and other biofilm based technologies. This also helps in checking the deterioration of groundwater resources from these MSW landfill sites.

As a part of upstream processing, it is equally important to ensure that only non-recyclable and inert waste is disposed, and no hazardous and bio-medical waste is entertained in landfills. Thus adequate waste segregation and utilization with bioprocesses like anaerobic digestion/ composting for organic waste treatment and management and incineration for biomedical waste can be followed before land filling. Furthermore adequate liners or barriers have to be installed in these landfill sites with proper capping for effective containment of the landfill wastes.

Conclusions

It has been concluded that leachate sample contain high concentration of organic and inorganic constituents. Heavy metals concentration was in trace amount as the waste in domestic in nature.

Leachate is found to have significantly high salinity and alkalinity as reflected in their values for conductivity, TDS, alkalinity and phi.

Based on BOD5/COD ratio suggested that the Mavallipura landfill leachate is medium aged leachate.

The Mavallipura Landfill leachate migration to the soil and water resources poses a significant threat to the environment and public health.

High LPI values indicate that the leachates generated from landfill site are not stabilized, resulting in high concentrations of heavy metals in leachate.

The water quality rating study clearly shows that, the status of the water bodies is eutrophic and it is unsuitable for the human uses.

The Mavallpura Landfill leachate migration to the soil and water resources poses a significant threat to the environment and public health.

References

  1. Ramachandra TV, Shruthi B (2006) Environmental Audit of Municipal Solid Waste Management, CEST Technical report-112, Energy & Wetlands Research group, Cente for Ecological Sciences, IISc, submited to financial assistance the ministry of environment and forests government of India.
  2. Robinson AH (2005) Landfill leachate treatment. Journal of Membrane Technology 6-12.
  3. Welander U (1998) Characterisation and treat- ment of municipal landfill leachates, Thesis at Department of Biotechnology, Lund University.
  4. APHA (1998) Standard Methods for Examination of Water and Waste water.
  5. Erig HJ (1989)Quantity and Quality of MSW Landfill Leachate, Sardinia, Second International Landfill Sypmposium.
  6. Kumar D, Alappat BJ (2003) A technique to quantify landfill leachate pollution.
  7. Chatterjee C, Raziuddin M (2002) Determination of water quality index (WQI) of a degraded river in Asansol Industrial area, Raniganj, Burdwan, West Bengal, Nature. Environment and Pollution Technology 1: 49-59
  8. Ministry of Environment and Forests (2005)
Select your language of interest to view the total content in your interested language
Post your comment

Share This Article

Article Usage

  • Total views: 9717
  • [From(publication date):
    June-2016 - Oct 23, 2017]
  • Breakdown by view type
  • HTML page views : 9458
  • PDF downloads :259
 

Post your comment

captcha   Reload  Can't read the image? click here to refresh

Peer Reviewed Journals
 
Make the best use of Scientific Research and information from our 700 + peer reviewed, Open Access Journals
International Conferences 2017-18
 
Meet Inspiring Speakers and Experts at our 3000+ Global Annual Meetings

Contact Us

Agri, Food, Aqua and Veterinary Science Journals

Dr. Krish

[email protected]

1-702-714-7001 Extn: 9040

Clinical and Biochemistry Journals

Datta A

[email protected]

1-702-714-7001Extn: 9037

Business & Management Journals

Ronald

[email protected]

1-702-714-7001Extn: 9042

Chemical Engineering and Chemistry Journals

Gabriel Shaw

[email protected]

1-702-714-7001 Extn: 9040

Earth & Environmental Sciences

Katie Wilson

[email protected]

1-702-714-7001Extn: 9042

Engineering Journals

James Franklin

[email protected]

1-702-714-7001Extn: 9042

General Science and Health care Journals

Andrea Jason

[email protected]

1-702-714-7001Extn: 9043

Genetics and Molecular Biology Journals

Anna Melissa

[email protected]

1-702-714-7001 Extn: 9006

Immunology & Microbiology Journals

David Gorantl

[email protected]

1-702-714-7001Extn: 9014

Informatics Journals

Stephanie Skinner

[email protected]

1-702-714-7001Extn: 9039

Material Sciences Journals

Rachle Green

[email protected]

1-702-714-7001Extn: 9039

Mathematics and Physics Journals

Jim Willison

[email protected]

1-702-714-7001 Extn: 9042

Medical Journals

Nimmi Anna

[email protected]

1-702-714-7001 Extn: 9038

Neuroscience & Psychology Journals

Nathan T

[email protected]

1-702-714-7001Extn: 9041

Pharmaceutical Sciences Journals

John Behannon

[email protected]

1-702-714-7001Extn: 9007

Social & Political Science Journals

Steve Harry

[email protected]

1-702-714-7001 Extn: 9042

 
© 2008-2017 OMICS International - Open Access Publisher. Best viewed in Mozilla Firefox | Google Chrome | Above IE 7.0 version
adwords