Optimization of Planning in Garment Manufacturing | OMICS International
ISSN: 2165-8064
Journal of Textile Science & Engineering
Make the best use of Scientific Research and information from our 700+ peer reviewed, Open Access Journals that operates with the help of 50,000+ Editorial Board Members and esteemed reviewers and 1000+ Scientific associations in Medical, Clinical, Pharmaceutical, Engineering, Technology and Management Fields.
Meet Inspiring Speakers and Experts at our 3000+ Global Conferenceseries Events with over 600+ Conferences, 1200+ Symposiums and 1200+ Workshops on Medical, Pharma, Engineering, Science, Technology and Business
All submissions of the EM system will be redirected to Online Manuscript Submission System. Authors are requested to submit articles directly to Online Manuscript Submission System of respective journal.

Optimization of Planning in Garment Manufacturing

Gordana Colovic*

The College of Textile-Design, Technology and Management, Belgrade, Serbia

*Corresponding Author:
Gordana Colovic
The College of Textile-Design
Technology and Management
Belgrade, Serbia
E-mail: [email protected]

Received Date: April 27, 2015; Accepted Date: April 28, 2015; Published Date: May 15, 2015

Citation: Colovic G (2015) Optimization of Planning in Garment Manufacturing. J Textile Sci Eng 5:199. doi: 10.4172/2165-8064.1000199

Copyright: © 2015 Colovic G. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.

Visit for more related articles at Journal of Textile Science & Engineering

Introduction

The daily production of clothing deals with many work orders, so it is necessary to complete Scheduling (shop floor control). Priorities can be determined on the basis of several rules:

- FIFO (first-in, first-out),

- FIFO (first-in, first-out),

- DDATE (earliest due date) - which product must be made first,

- CUSTPR (highest customer priority) - first the product for priority customers,

- SETUP (similar setup) - first the similar products which require a minimum setting of machines,

- SPT (shortest processing time) - priority for products that last for the shortest period,

- LPT (Longest Processing Time) - priority for products that last for the longest period.

Priority DDATE can have variations:

- SLACK (Slack minimum) - priority for jobs that have less time margin:

- CR (smallest critical ratio) - priority for jobs with smaller ratio of the remaining time to maturity and remaining processing time:

If CR > 1, then the product is made before the deadline

If CR < 1, then it’s late

If CR = 1, then it is done on time

Already deployed operations often change their order, since there are new jobs coming into production. Scheduling is performed according to the above rules, which can be modified in a way that corresponds to the number of resources or the complex global rules:

- Expanded SPT (shortest processing time) - jobs are divided into A, B and C, according to their duration. Jobs A are performed with a minimum duration, but every few hours the production is interrupted and job B is performed. Jobs C are performed every day each.

- WINQ (work-in-next-queue) - sees the duration of performing job at the next resource.

- NOPN (fewest number of remaining operation) - according to the number of resources that are yet to be used.

- S/OPN (Slack per remaining operation) - according to the time reserve for the rest of the job.

- RWK (Remaining work) - a variant of SPT, the duration of performing whole job on all resources.

Resources which are bottlenecks have a negative effect on the process efficiency, because they limit its real capacity and do not provide a high-quality, fast and flexible production. Goldratt’s limiting theory [1], defines a bottleneck in the process or in the company, because it assumes that the goal of every company is to “create money”. Limiting theory is what prevents the system or process to reach a higher level of performance, i.e. it focuses on real capacity, inventory and production costs. Goldratt’s theory coordinates production flow with demand according to the following principles:

1. It is necessary to harmonize the flow of the process, not the capacities of phases of the process,

2. Efficiency of bottleneck is not determined by its capacity, but by other constraints,

3. Utilization and use of resources are different concepts,

4. An hour wasted due to the bottleneck is an hour lost for the entire process,

5. An hour saved at bottleneck is an illusion,

6. Series of transfer do not need to be equal to the size of the production series,

7. Sizes of production series do not need to be fixed,

8. Lead time of process is the result of designing process,

9. When designing a process one should always bear in mind the constraints (bottlenecks) [2].

Technological process of production of clothing uses the technique of parallel ways of moving cut parts of garment from one operation to another together with scheduling and deployment of technological operations on the production capacities by checking the availability of resources. Thereby the making or installation of certain parts of garment is performed by an arbitrary number of operations whose scheduling is known to everybody, as well as the duration of individual operations. The optimization of technological operations is shown in Figures 1 and 2.

textile-science-technological-operations

Figure 1: Optimization of technological operations.

textile-science-Network-diagram

Figure 2: Network diagram.

The most frequently used expressions for the network activities are CPM (Circle Plan Methods), PDM (Precedence Diagramming Method) and PERT (Program Evaluation and Review Technique), and the types of networks are:

o AOA (Activity-on-arc).

o AON (Activity-on-node).

References

Select your language of interest to view the total content in your interested language
Post your comment

Share This Article