Make the best use of Scientific Research and information from our 700+ peer reviewed, Open Access Journals that operates with the help of 50,000+ Editorial Board Members and esteemed reviewers and 1000+ Scientific associations in Medical, Clinical, Pharmaceutical, Engineering, Technology and Management Fields.
Meet Inspiring Speakers and Experts at our 3000+ Global Conferenceseries Events with over 600+ Conferences, 1200+ Symposiums and 1200+ Workshops on
Medical, Pharma, Engineering, Science, Technology and Business

The Study of using Wind Energy to Hydropower Designs with Pump

C Badaluta Minda*
Politehnica University of Timisoara, Hydrotechnical Department, Timisoara, Timis, 300022, Romania
*Corresponding Author : C Badaluta Minda
Politehnica University of Timisoara
Hydrotechnical Department
Timisoara, Timis, 300022, Romania
Tel: +40256-404096
E-mail: [email protected]
Recieved date: Jan 26, 2016; Accepted date: Feb 03, 2016; Published date: Feb 10, 2016
Citation: Minda CB (2016) The Study of using Wind Energy to Hydropower Designs with Pump. Hydrol Current Res 7:224. doi: 10.4172/2157-7587.1000224
Copyright: © 2016 Minda CB. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Related article at Pubmed, Scholar Google

Visit for more related articles at Hydrology: Current Research

Abstract

New hydropower with pump can be a continuous development within the national energy system. Their principle is to cheap energy consumption power P1 E1 produced at the base of the schedule task for pumping water from a reservoir situated at odds, in a lowered reservoir situated at height. While producing more energy expensive peak E2 to power P2 is achieved by whirling such volumes. The difference in cost between the basic energy absorbed by pumping the peak produced at whirling ensures profitability of these facilities. Regarding the current hydropower system nationwide to establish the existence of hydro-technical systems with pumping and gravitational systems this can be turned into ones with pumping. In analysing the conditions of work opportunity and search engine optimization of wind energy at the base of hydropower facilities with pumping system may be transformed-High Barzava. Limits are fixed to the unit cost of wind energy is competitive for its use as a primary source.

Keywords
Wind energy; Hydropower system with pumping and gravity; Primary source; Reservoir
Introduction
In an arrangements scheme of hydropower plant with pump, turn the energy reservoir hydraulic potential energy, kinetic energy respectively by rotating turbine hydropower plant and finally into electric power.
In periods with low electricity consumption (at night) operates the pumping aggregates, which pumps water to the upper reservoir by storing energy, and in periods with high power consumption (during peak periods) operating system whirling of water stored in the pumping phase to produce electricity. A hydro-electric power which utilizes a fall depends on two factors: the flow of water and the gross loss, the difference between the elevation where this source is restores and the place where it is returned to the environment through a whirling. In areas where we have wind energy we can use at primary (pumping), when its cost is lower than the peak energy (Figure 1).
In 2010, Romania has adopted the law for the promotion of renewable energy, an important step in the development of renewable energy in our country. Estimated annual energy potential of wind in Romania is estimated at around 23 TWh, and areas of interest are those in which the average wind speed is at least equal to 4 m/s.
At the beginning of 2012 in Romania there were over 1000 wind turbines that produce 3% of total energy [1]. Windings power stations in our country are producing an average of 150-200 megawatts/hour. The cost of wind energy is 170 euros per megawatt/hour, nearly three times as much in relation to energy produced from hydroelectric power plants.
On the basis of the evaluation and interpretation of the data recorded in Romania you can mount the wind installations with a capacity of up to 14,000 MW, which means a contribution of electricity almost 23,000 GWh/year [2-4]. According to a study of ErsteGroup, the country's wind power potential, estimated at 14,000 MW, is the largest in South-Eastern Europe and the second in Europe [5].
Analysis of Schemes for Hydropower Facilities
The necessity of construction of AHP (arrangement scheme with pumping) results and the need to cover the variable energy consumption over time, both in terms of variation in daily and seasonal and annual consumption. After the operation, AHP were classified [6]: closed circuit, where pumping volume equal to the volume of gross, and whirling falls are equal
(V1 = V2; Hb1 = Hb2).
Closed circuit-mixed: V2 =V1+ΔV; Hb1=Hb2
With open circuit: V1=V2; Hb2= Hb1+ΔH
Open-circuit-mixed: V2 =V1+ΔV; Hb2= Hb1+ΔH
The principle of these schemes with hydropower (AHP) is the consumption of cheap energy E1P1 power produced at the base of the graph of the task for pumping water from a lake located the build-up descended into a reservoir located high and energy more expensive peak power P2 E2, whirling volumes thus accumulated. The difference in cost between the energy absorbed by the base and the peak primary produced from secondary arrangement ensure profitability. Cycle energy transformations through AHP consist of two distinct phases, namely:
- mayor phase (pumping) in which energy network are taken power, the water being pumped from the lower reservoir in the superior lake(Figures 2 and 3);
- phase relation (whirling) in which the water stored in Lake superior is being restored to power whirled network;
In certain circumstances become cost-effective AHP [7]:
AHP closed circuit
AHP Closed circuit characterized by driving head equal (Hb1=Hb2=Hb),
H1>H2-waterfall net with H1 = Hb + hr1 and H2=Hb-hr2; Qi1<Qi2-installed debits for P1<P2;
E2=E1.ŋ, (ŋ = 0.60-0.70).
The loss of energy is:
ΔE = E1 -E2 = (1-η) E1 = (0.3- 0.4) E1[KWh/cycle] [8]
Considering the ratio between peak energy value p2 energy produced and p1 base consumed for pumping 4 ratios, gross income and expenses of the pumping energy will be:
image
AHP mixt closed circuit
AHP mixt closed circuit is inserted into the addition volume ΔV (m3/cycle) from rainfall collected on hillsides or in capturing some of the tributaries, and in this case the energies will be:
image
By writing image results: image
Energy loss in a cycle will be:
image
Taking into consideration the overall efficiency η=0.65[7] it has been established that
If ΔV >0.54V1, AHP produces more energy than the energy consumed for pumping.
AHP with open circuit
The energies will be:
image E2 >E1 Produces more energy than consumed energy for pumping.
Loss of energy will be;
image
image Produces more energy than
consumed energy for pumping.
AHP open mixed circuit
Captures the reservoir an additional volume (ΔV) to the same energy E1 at primary, and the energy produced to secondary will be [9]:
image
The ratio of energies:
image
If image
Case Study
Geographic location and characteristics
River Barzava has a basin with an area of 971 km2, all being small tributaries with areas why not exceeding 100 square kilometres. Due to both the large industrial and drinking water in the municipality of Resita hydro technical works were required, aimed at supplementing water for using stock by transferring some flows from neighbouring basins and redistribution of leakage through the dam Lakes. The system now comprises hydro technical Barzava Superior(Figure 4) channel Nera (6,575 km. length, peak discharge 1.75 m3/s) with the role of one of some water flows from the Nera river basin catchment area in Barzava; - Semenic-channel (L=23.3 km, Q=1.43 m3/s) with the role of one of certain flows of water from the water catchment basin in Barzava - accumulation “Trei Ape” (6,008 million gross volume m3; useful volume 4,363 mil.cm) situated on the upper course of Timis, aiming for an additional reserve of water in the catchment area Barzava after transfer through pump station and Semenic channel. - Gozna accumulation (12,357 mil.m3 gross volume; volume useful of 10,269 mil.m3) Valiug accumulation (1, 06 gross Volume mil.m3, volume useful 0,916 mil.m3, maximum outflow of 87 cm/s, emptying the bottom is clogged). Accumulation Secu (gross volume 11,109 m3, maximum outflow of 135 m3/s). The system comprises a series of canals and water transport (main Channel, channel Gozna, etc.) with the role of transporting water to hydroelectric and the water utilizations. Crainicel, Breazova and Grebla hydro powers has arranged in cascade and utilizes a total waterfall of 323 m.
Hydro powers Crainicel, Grebla andBreazova mostly natural debt collected from ponds Barzava, Timis, Nera. Their arrangement in a tandem allows the use of the natural loss of the river Barzava, although not managed just a capitalization 40% of the natural waterfall of 323 m, which results in possible future expansions of the hydro arrangements from the point of view of energy.
Analysis Results and Discussion
Mixed open circuit (Figure 5) was put in operation for the derivation of water from the river Timis in Barzava through pumping from the three UHE (Crainicel, Breazova and Grebla) located in the waterfall on the river Barzava and other utilizations (water supply, industry, etc.).
If you apply the theoretical methodology for system Barzava-Timis, where:
-Mayor consists of “Trei Ape” reservoir located on the river Timis, delivery pipe and Electro pumps that upset jumping V1 towards upstream channel with Hb1 =195 m.
-The second arrow is composed of three hydroelectric power plants located in the Waterfall on the river Barzava with Hb2=745 m and ΔH=550 m.
image
From the above date results report energies (relationship 15) being 2.3, so the energy produced by the E2 is 2.3 times higher than E1 consumed by the pumps. The ratio between the gross income and the cost of pumping energy is:
image
What ensures the recovery of investment in the primary (the one in the secondary being amortized) in a time Tr<8 years (secondary investment does not enter into consideration, because the investments were amortized hydroelectric power stations) [10]. Considering that the energy needed for pumping high expense represents (considering a function period (Tu) of 1,500 hours for AHP) [7] taking into consideration is the preferable option of unparalleled energy. For taking into account wind energy, it is important and unparalleled cost of this energy (p1e). An evaluation of this cost results from:
image
Having regard to this and applying for AHP for the river Barzava will result:
image
By comparing the ratios of gross revenues and expenditures with the energy needed for pumping data relationships [11] and [12] shall establish a decrease of their value because it replaces a primary energy cheap one with me about 50% more expensive at pumping water. Analysing the terms of relationship recovery time of the investment, in this case we have:
AHP:
image
Where:
Tr=investment recovery time and must fulfill the condition: Tr<TN
TN=recovery time of the normed
I=Investments made for the realization of the AHP in the utilization assumption primary
power base of the national energy
Vbr=gross income realized by AHP in the same hypothesis
C=the annual costs of production in the same hypothesis
Replacing the primary power source to wind power pumping result:
image
Where:
ΔI - the investment that is needed to supplement the replacement power supply
image -Additional gross income achieved through the use for other purposes the primary energy taken for pumping from national energy network image- additional production costs, using wind energy for pumping image- represents the cost of pumping increase energy using wind energy more expensive
In order to achieve the same as AHPE (economic efficiency as well as AHP must: Tr =Tre,
image
results so that investment should be recovered while at the same time with the investment of additional income realized through use in other purposes of pumping energy, taking into account the increase in the cost of energy from the unparalleled [13].
Taking into account the fact that ΔVbr = E1p1 and ΔC = αE1p1 results:
image a criterion that allows setting the degree of increase (α) you incur the cost of wind power energy to basic energy, if you know the expenses necessary for the AHP version pump (using energy), additional investment for achieving AHPE and Tr recovery time of AHP.
References

Figures at a glance

Figure Figure Figure Figure Figure
Figure 1 Figure 2 Figure 3 Figure 4 Figure 5
Select your language of interest to view the total content in your interested language
Post your comment

Share This Article

Article Usage

  • Total views: 7896
  • [From(publication date):
    March-2016 - Sep 25, 2017]
  • Breakdown by view type
  • HTML page views : 7831
  • PDF downloads :65

Review summary

  1. Paul
    Posted on Sep 15 2016 at 12:30 pm
    Authors narrated a review article regarding the usage of wind energy to hydropower designs with pumps. The author has done an excellent job in compiling all the known, predicted, and acquired risk factors. The information represented in the article will help in the furtherance in this field.
 

Post your comment

captcha   Reload  Can't read the image? click here to refresh

Peer Reviewed Journals
 
Make the best use of Scientific Research and information from our 700 + peer reviewed, Open Access Journals
International Conferences 2017-18
 
Meet Inspiring Speakers and Experts at our 3000+ Global Annual Meetings

Contact Us

Agri, Food, Aqua and Veterinary Science Journals

Dr. Krish

[email protected]

1-702-714-7001 Extn: 9040

Clinical and Biochemistry Journals

Datta A

[email protected]

1-702-714-7001Extn: 9037

Business & Management Journals

Ronald

[email protected]

1-702-714-7001Extn: 9042

Chemical Engineering and Chemistry Journals

Gabriel Shaw

[email protected]

1-702-714-7001 Extn: 9040

Earth & Environmental Sciences

Katie Wilson

[email protected]

1-702-714-7001Extn: 9042

Engineering Journals

James Franklin

[email protected]

1-702-714-7001Extn: 9042

General Science and Health care Journals

Andrea Jason

[email protected]

1-702-714-7001Extn: 9043

Genetics and Molecular Biology Journals

Anna Melissa

[email protected]

1-702-714-7001 Extn: 9006

Immunology & Microbiology Journals

David Gorantl

[email protected]

1-702-714-7001Extn: 9014

Informatics Journals

Stephanie Skinner

[email protected]

1-702-714-7001Extn: 9039

Material Sciences Journals

Rachle Green

[email protected]

1-702-714-7001Extn: 9039

Mathematics and Physics Journals

Jim Willison

[email protected]

1-702-714-7001 Extn: 9042

Medical Journals

Nimmi Anna

[email protected]

1-702-714-7001 Extn: 9038

Neuroscience & Psychology Journals

Nathan T

[email protected]

1-702-714-7001Extn: 9041

Pharmaceutical Sciences Journals

John Behannon

[email protected]

1-702-714-7001Extn: 9007

Social & Political Science Journals

Steve Harry

[email protected]

1-702-714-7001 Extn: 9042

 
© 2008-2017 OMICS International - Open Access Publisher. Best viewed in Mozilla Firefox | Google Chrome | Above IE 7.0 version
adwords