S.No Particulars Units Quantity
1 Diameter of well m 2
2 Depth of well m 20
3 Level of flaming lantern m 5
4 Level of strong flame extinguished m 8
5 Level of gas from the top m 5
6 Level of gas after first round of application of Geoact-Ca5 m 16
7 Level of gas after second round of Geoact–Ca5 application m 20
8 Gas eradication rate per round m 7.5
9 Cost of CO2 gas eradication per instance of gas presence in well Rs  5
1US $=INR 48/(Approximate)
Table 1: Details of particulars of well and eradication operation.
Goto home»