ISSN: 2155-9910

Journal of Marine Science: Research & Development
Open Access

Our Group organises 3000+ Global Conferenceseries Events every year across USA, Europe & Asia with support from 1000 more scientific Societies and Publishes 700+ Open Access Journals which contains over 50000 eminent personalities, reputed scientists as editorial board members.

Open Access Journals gaining more Readers and Citations
700 Journals and 15,000,000 Readers Each Journal is getting 25,000+ Readers

This Readership is 10 times more when compared to other Subscription Journals (Source: Google Analytics)
Google Scholar citation report
Citations : 2494

Journal of Marine Science: Research & Development received 2494 citations as per Google Scholar report

Indexed In
  • CAS Source Index (CASSI)
  • Index Copernicus
  • Google Scholar
  • Sherpa Romeo
  • Open J Gate
  • Genamics JournalSeek
  • Academic Keys
  • ResearchBible
  • Ulrich's Periodicals Directory
  • Electronic Journals Library
  • RefSeek
  • Directory of Research Journal Indexing (DRJI)
  • Hamdard University
  • EBSCO A-Z
  • OCLC- WorldCat
  • Scholarsteer
  • SWB online catalog
  • Virtual Library of Biology (vifabio)
  • Publons
Share This Page

Impact of the construction of Grand Renaissance Ethiopian Dam on Lake Naser sediment and its utilization

3rd International Conference on Oceanography

Abdelazim Negm and Haitham Mohamed

Posters-Accepted Abstracts: J Marine Sci Res Dev

DOI: 10.4172/2155-9910.S1.011

Abstract
Currently the amount of sediment in Lake Naser (LN) formed upstream (US) of Aswan High Dam (AHD) is about 6 billion cubic meter. The finer sediments exist near to the dam in the Egypt side of LN while most of the courser sediments were accumulated within 150 km of LN is the Sudan Side. Before the construction of Grand Renaissance Ethiopian Dam (GERD) the accumulated sediment in LN was increasing progressively. This situation will differ completely after the completion of GERD construction and becomes in active operation. In all cases of operations, a significant amount of sediment will be retained US of GERD and the released amount of sediment to the downstream (DS) side will be smaller or negligible compared to the absence of GERD. Assuming that the dam will be completed according to the announced height and storage capacity and assuming that the dam will be used only for power generation, the released water to the DS will be mostly clear water or water with little sediment contents. This hungry water will change the morphology of the river reaches DS of GERD including the sediment redistribution of the sediment accumulated within LN. One of the possible scenarios is part of this sediment will move from Sudan side to Egypt side of the lake with the possibility of moving towards the AHD. The different scenarios resulting from using numerical simulations with different flow conditions and suspended sediment load ranging from maximum to minimum possible situations will be discussed. Also, the possible utilization strategies of the sediment will be discussed.
Biography
Relevant Topics
Top